The Lift and Build / House Raise Process
Believe it or not, raising the actual house is actually a small component of a Lift and Build project, which often includes extensive extensions, renovations, slabs, decks and high end finishes to the internal rooms and landscaping. This is why Brisbane residents engage builders like us for their Lift and Raise when renovating or extending their homes. At Woolley Constructions, we love the satisfaction these projects provide, which is why we specialise in house raise projects where we can work with you, trades and external experts to co-ordinate lift and build unders from start to finish.
Some common questions we get asked before starting a house raise project?
How long will you be out of the house for? The answer to this is that it depends. About the quickest that the project could be done in a safe manner to get you back in with all your services reconnected is six weeks. Some companies may tell you less, but the reality is that if you’re dealing with a responsible builder it takes a good six weeks. The last thing you need is to be climbing into a house on a ladder because your stairs aren’t fitted at week 5 as promised. It’s a good idea to have suitable accommodation organised to account for the house raising and construction period. Really this needs to be considered as part of the construction costs. And six weeks may sound like a long time to be out of the house, but it would be a lot longer if you had to knock down and build new. Perhaps try to tie some annual leave in with this period, particularly at the beginning of the house raising project when most of the work going on is structural by nature and doesn’t require client input.
Can you leave furniture in the house when raising? The answer is yes, however, please keep in mind that any valuables and goods are at a higher risk of damage. Thieves have been known to target constructions sites. There is a slightly higher chance of fires and movement may cause some disruption. In saying this, it’s not practical to keep furniture or items in a house if extensive renovations are to occur upstairs. Where there is extensive renovations as part of a colonial restoration these projects can take up to six months to complete.
Do you need an approval to raise a house in Brisbane? The answer is you do need a Building Approval to House Raise in Brisbane. This is started with the planning process whereby you engage us to help with your drawings for design, then we complete the engineering plans, all the while making sure that your project will be approved for construction.
Can you slide or reposition the house on the block? The answer is yes. The cost of sliding a 3 bedroom house will often be $2000 and $2500 per metre. This is a small element to the overall construction cost and could be a valuable investment if you want to make your back yard bigger. If you’re lucky enough to have two lots, you may even be able to move the house over to fit it on one lot, freeing up a parcel of land.
Can I raise a house and build in at a later date? The answer is yes. This is quite common and a reasonable way to manage unknown costs. For example, it’s nice to get to a point and know where your finances are at. At this point we get a lot of questions from people asking if they can open up underneath the house fully, because they’re not exactly sure where they’re going to put the walls up later. In this scenario, it’s important for you the client to be decisive. You’re undergoing a construction project. All construction projects have plans. You need to think ahead and come up with your plan, even if you’re not going to build under straight away.
Being a decisive customer is one of the best ways to save yourself money and the builder’s time, which is ultimately going to save you more money. Get your plans right, these dictate where you’re walls will go under the house and ultimately where your post will go in the interim to support the house. If you’re not building under straight away – we call this a first stage raise, basically within a 6 week time frame, we’ll raise, restump, reconnect services, concrete under the existing house, fit stairs and get you back into your home. The plans are drawn in a way that indicates this, but all the provisioning is provided and accounted for in the second phase. It should be noted that at the end of the first stage you’ll be able to obtain a final building approval for works to date. This is important, because if your circumstances change, you’ll be easily be able to sell the house with the approvals and plans in place.
We hope you found the answers to these common questions regarding lift and build-under projects useful.